Calculating Monthly Cloud Costs and Preventing Bill Overruns
9 min read Read more ↗
Search strategies and engineering for the modern business landscape.
Six service pillars delivered by one team, from design and development to cloud, security, growth, and day-to-day support.
Legia designs workload placement in the cloud sized to your needs, then runs the migration in stages. Cost control is set up from the start, so monthly bills do not grow without explanation.
Pricing
Cost splits in two: the migration work, paid once, and the monthly cloud bill, paid directly to the provider. Legia estimates both from the start so no bill shows up later.
> Project plan
Cloud Migration & Architecture · 5 stagesA general view of the order and length of each stage. A change in scope moves the estimate, and the details are agreed after the consultation.
For a mid-size workload, the whole process generally takes 2 to 4 months. The exact duration depends on the number of workloads and how tightly the old systems are tied to one another, and the move order is set so the riskiest part is not done first.
Legia's full processTechnology
The tools actually used on this work. The choice adapts to the systems you already run rather than being forced into one mold.
Cloud providers
Chosen from technical needs and a cost comparison, including local cloud and VPS providers.
Automation and orchestration
Used when needed: configuration as code and large-scale container management.
Security layer
Traffic filtering in front of the server.
Why Legia
Cloud migrations often end as a bill that rises without explanation. These five things keep placement, cost, and the way back readable.
01 · Engineering
An architecture document covering where each component sits, why it was chosen, and its estimated monthly cost.
02 · Ownership
All infrastructure configuration is documented and traceable. When needed, it is kept as code in your repository so it can be repeated.
03 · Engineering
The design uses services that have equivalents at other providers, so moving does not mean rebuilding.
04 · Ownership
A plan to return to the original state for each migration stage, not just for the project as a whole.
05 · Reports
A monthly cost review while the project runs, with savings recommendations that can be acted on right away. After handover it can continue through a management subscription.
FAQ
Haven't found your answer? Tell us what you need, and the Legia team replies within 1 business day.
Ask the Legia team ↗A cloud migration service moves systems from old servers to the cloud in a planned way: assessing what is worth moving, designing placement and sizing, moving in stages, then setting up cost control. Legia handles AWS, Google Cloud, Microsoft Azure, and local providers, with the old system staying up until the new one proves stable.
The basis is the number of workloads moved, how tightly the systems are linked, and whether cost control and monitoring are included. Legia gives the details after the readiness assessment, and that stage can be taken separately.
No. The cloud provider's bill is paid directly by you in your company's name, separate from Legia's service fee. That way usage and cost stay under your control. Paid software licenses are also billed directly by their provider.
No. Some systems make more sense staying on your own infrastructure, especially when their usage pattern is stable and predictable. Legia gives the comparison in the readiness assessment report.
Legia labels every resource, sets budget limits and usage alerts, and sizes resources to the real load. Monthly reviews include savings recommendations that can be acted on right away.
No. Workloads are moved piece by piece and run alongside the old system until proven stable. The full switch is done in a time window you set, and each stage has a rollback plan.
Access rights per person and per role, two-step authentication for admin accounts, data encryption, backups, and access logs. The rules go into the architecture document, so they can be reviewed before the migration starts.
For a mid-size workload, the whole process generally takes 2 to 4 months, from readiness assessment to handover. The exact duration depends on the number of workloads and how tightly the old systems are tied together, so Legia gives a stage-by-stage schedule after the readiness assessment.
Legia handles AWS, Google Cloud, and Microsoft Azure, as well as local cloud and VPS providers. The choice is driven by technical needs and cost comparison, not vendor preference.
Cloud migration is a project to move and reorganize systems in the cloud, complete with placement design and cost control. Server Installation & Management sets up and looks after the servers themselves every month, in the office or in the cloud. The two often come in sequence: migration first, then ongoing management.
Your team can manage it with the documentation and training handed over. If you prefer to hand it off, the Server Installation & Management or IT Support & Infrastructure Management service handles it on subscription, including its monthly cost review.