Website & UI/UX
Website Development
Company websites that load fast, stay secure, and that your own team can update.
2–3 weeks · Small-scale website work 30 days · Warranty after the Handover Record
- First stage
- Needs assessment (3–5 business days)
- What to prepare
- A company brief, examples of websites you like, and the list of pages you want.
- Cost is based on
- Number of pages and the type of each page; Number of custom-designed layouts; Number of languages shown
Learn about Website Development Website & UI/UX
Website Maintenance
Monthly care that keeps your website online, secure, and up to date without an in-house IT team.
15 minutes · Initial response to incidents during business hours Daily · Backups that can be restored
- First stage
- Initial audit (3–5 business days)
- What to prepare
- Access to website administration and hosting.
- Cost is based on
- Number of websites maintained; Hours allocated for small changes; Backup frequency and retention
Learn about Website Maintenance Apps & Software
Web Application Development
Service portals, document archives, and CMS dashboards with role-based login, built in stages with source code that belongs to you.
3–6 months · A mid-size system through to full use 2–3 weeks · Gap between versions you can try
- First stage
- Needs assessment (1–2 weeks)
- What to prepare
- Time for the operations team to be interviewed, and examples of the documents used today.
- Cost is based on
- Number of modules and workflows; Number of user roles and their permission rules; Integration with systems already running
Learn about Web Application Development Apps & Software
Mobile App Development
Android and iOS apps, cross-platform or native as needed, complete with backend and security.
Android & iOS · Cross-platform or native, chosen to fit the need 3–6 months · A mid-size scope through to store release
- First stage
- Needs assessment & platform choice (1–2 weeks)
- What to prepare
- A picture of who the users are and where they work.
- Cost is based on
- Number of screens and flows in the app; Target platforms: Android, iOS, or both; On-device data storage and sync needs
Learn about Mobile App Development Apps & Software
DevOps & CI/CD
Automated release pipelines, consistent environments, and monitoring that your own team can run.
9–15 weeks · The whole process, from assessment to handover 4 metrics · Measured before and after the work
- First stage
- Mapping the current flow (1 week)
- What to prepare
- Repository access and time to interview the developer team.
- Cost is based on
- Number of applications in the release flow; Number of environments made consistent; State of the release flow running today
Learn about DevOps & CI/CD IT Infrastructure & Cloud
Office Network Installation
LAN cabling, fiber optics, wireless access points, and server racks, with every point tested before handover.
Per point · Testing is done and recorded before handover Cabling plan · Handed over with point and panel numbering
- First stage
- Site survey (2–5 business days)
- What to prepare
- Building floor plan, access to work areas, and the number of users per room.
- Cost is based on
- Number of network points installed; Length and type of cable runs, copper or fiber; Number and class of active devices
Learn about Office Network Installation IT Infrastructure & Cloud
Server Installation & Management
Setup, hardening, monitoring, and migration for physical, virtual, and cloud servers.
2–4 weeks · Mid-size system migration Monthly · Reports on availability, incidents, and resource use
- First stage
- Infrastructure audit (3–7 business days)
- What to prepare
- Access to servers and infrastructure accounts.
- Cost is based on
- Number of servers and environments managed; Volume of data moved; Availability level requested
Learn about Server Installation & Management IT Infrastructure & Cloud
Cloud Migration & Architecture
Workload placement design, staged migration, and control over monthly cloud costs.
Staged · Migration runs alongside the old system 2–4 months · The whole process for a mid-size workload
- First stage
- Readiness assessment (1–2 weeks)
- What to prepare
- Access to the running systems and time to interview the technical team.
- Cost is based on
- Number of workloads moved; Data volume and time needed to move it; Number of environments prepared
Learn about Cloud Migration & Architecture Cybersecurity
Penetration Testing
Manual testing that proves how far a vulnerability can be exploited, with the evidence to back it up.
3 methods · Black box, grey box, and white box 3–6 weeks · The whole process, from permission to retest
- First stage
- Scope & permission (3–5 business days)
- What to prepare
- Signing the permission letter and naming an emergency contact.
- Cost is based on
- Number of websites or web applications tested; Method used: black box, grey box, or white box; Number of user roles tested
Learn about Penetration Testing Cybersecurity
Vulnerability Assessment
Broad mapping of security weaknesses, ranked by priority with the steps to fix them.
2–4 weeks · The whole process, from scope to retest Monthly · Monthly periodic checks available
- First stage
- Scope definition (2–3 business days)
- What to prepare
- The asset list and signing the permission letter.
- Cost is based on
- Number of hosts, applications, and IP addresses; Scope: internet-facing assets only, or including servers and cloud; Check frequency: one-off or monthly
Learn about Vulnerability Assessment SEO & Digital Marketing
SEO
Technical fixes, content structure, and local search, measured through to incoming inquiries.
1–2 months · The impact of technical fixes starts to show Months 3–6 · Growth in search visits starts to appear
- First stage
- Audit & mapping (2–3 weeks)
- What to prepare
- Access to Search Console, Analytics, and website administration.
- Cost is based on
- Number of pages optimized; Weight of the technical fixes at the start, including page load speed; Number of new articles and pages per month
Learn about SEO IT Support & Consulting
IT Support & Infrastructure Management
Servers, cloud, network, and workstations run by one team, under one contract and one report.
One channel · Every request is ticketed and tracked Monthly · A report on requests, incidents, and recommendations
- First stage
- Initial inventory (1–2 weeks)
- What to prepare
- Access to the systems and time for on-site review if needed.
- Cost is based on
- Number of servers and cloud environments; Number of workstations and employee accounts; Number of office locations
Learn about IT Support & Infrastructure Management IT Support & Consulting
Dedicated Team
Engineers who work full time inside your team, without a hiring process of your own.
2–3 weeks · Estimate from agreement to team members starting work Monthly · A rolling contract whose scale can be adjusted
- First stage
- Needs assessment (3–5 business days)
- What to prepare
- A picture of the team makeup, tools in use, and the nearest release target.
- Cost is based on
- Number of team members; Roles and seniority levels; Agreed contract length
Learn about Dedicated Team IT Support & Consulting
IT Consulting
Staged technology recommendations with cost estimates, before any budget is spent.
1–2 weeks · A second opinion on vendor quotes 3–6 weeks · System review and technology plan
- First stage
- First conversation (30–60 minutes)
- What to prepare
- A picture of the situation, or the vendor quote being considered.
- Cost is based on
- Breadth of the system and number of units reviewed; Number of vendor quotes reviewed; Depth of cost estimate requested
Learn about IT Consulting This summary goes into the form below. You only need to fill in your name and contact details.